(02) 6836 5888
mail@cobar.nsw.gov.au

Euabalong Bridge Replacement Project – RFT-2004871

Construction of (2) reinforced concrete bridges in Euabalong, 531 km west of Sydney and 222 km south of Cobar.

Council wishes to replace the following existing 3-tonne weight limit bridges over the Booberoi Creek (an anabranch system off the Lachlan River):

  •  SR22: Round Hill Road Bridge
    SR23: Booberoi Road Bridge.

The Works forming this Contract include, but are not limited to:

  • Demolition and removal of the two (2) existing bridges and associated earthworks.
  • Construction of one (1) temporary bridge/crossing (bypass track by Cobar Shire Council). The bridge will suit a single-lane bypass track with a minimum T44 design loading.
  • Construction of two (2) new bridges.
  • Other associated Works.

The two new double-lane bridges are designed for SM1600 traffic loading per AS5100.2-2017. They have a weight limit of 100 tonnes, allowing heavy agricultural machinery and trucks to cross. The ease of access will improve the efficiency of farming/agricultural enterprises and companies.

Please click HERE to access the link to the required documents.